On the afternoon of October 17, 2024, at the headquarters of Power Engineering Consulting Joint Stock Company 1 (PECC1), a Contract Signing Ceremony for the Project Management Consulting for 2 projects, Yen Bai 1 Biomass Power Plant with capacity of 50MW and Tuyen Quang Biomass Power Plant with...
Chi tiết...
Power Engineering Consulting Joint Stock Company 1 (PECC1), the company with nearly 60 years of experience, is a pioneer in the construction consultancy of thermal power plants in Vietnam.
Chi tiết...
In the morning of September 11, 2024, in Hang Gon commune, Long Khanh city, Dong Nai province, the Groundbreaking Ceremony of the Survey of the “Center for Nuclear Science and Technology” Project took place with the participation of Mr. Do Viet Khoa - Deputy General Director and other PECC1...
Chi tiết...
On the morning of August 29th, 2024, in Thanh Hoa, Mr. Nguyen Huu Chinh - General Director of EVNPECC1 and the Company's leadership delegation attended the Inauguration Ceremony of the 500 kV transmission line circuit 3 project from Quang Trach (Quang Binh) to Pho Noi (Hung Yen).
Chi tiết...
On January 24, in Kon Tum, Mr. Nguyen Huu Chinh - General Director of PECC1 attended the ceremony to summarize the emulation movement in 2023 and launch the emulation movement in 2024 for Ialy Extension hydropower project. The ceremony was organized by Vietnam Electricity (EVN), Vietnam Electricity...
Chi tiết...
On December 9, 2023, Song Bung 5 Hydropower Plant (Song Bung 5 HPP) officially completed 21 days ahead of the target set by Power Engineering Consulting Joint Stock Company 1 (PECC1) for the power generation plan of the year 2023. The Decision No. 31/QD-TVD1-P2 dated February 10, 2023 has posed a...
Chi tiết...
In the morning of September 30, 2023, Mr. Nguyen Tai Anh - Deputy General Director of EVN (cum Chairman of the Board of Directors of PECC1) and Mr. Nguyen Kim Cuong - Deputy General Director of PECC1 and Company officials attended the "Construction launch ceremony of the 500kV Monsoon - Thanh My...
Chi tiết...
On the afternoon of June 1, 2023, Deputy General Director of EVNPECC1 - Mr. Tran Thai Hai and a delegation of officials and experts participated in the workshop on grid connection, operational management and technical aspects of offshore wind. The workshop is jointly organized by Vietnam Electricity...
Chi tiết...
On May 16, 2023, EVNPECC1 Deputy General Director – Mr. Nguyen Kim Cuong arrived Bangkok, Thailand to participate in the “Future Energy Asia 2023” Exhibition and Summit (FEA) taking place in 03 days, from May 17 – May 19, 2023.
Chi tiết...
In the morning of November 7, 2022, Mr. Nguyen Huu Chinh - General Director of EVNPECC1, and a delegation of staff attended the 3rd Annual Conference Hydro Power Asia 2022, with the subject of "Key Trends and Technologies, Opportunities and Outlooks" ". This is one of the most notable hydropower...
Chi tiết...
On August 23, 2022 at PECC1’s Headquarter, the Seminar on “Advanced Solutions for Waterproofing and Repairing for Energy and Hydraulic Industry” was held by Power Engineering Consulting Joint Stock Company 1 (PECC1) and MC – Bauchemie Group (Federal Republic of Germany).
Chi tiết...
On the afternoon of August 2, 2022, PECC1 Deputy General Director, Mr. Nguyen Kim Cuong and other experts attended the Hydrogen ASEAN Summit and Exhibition 2022 as one of the speakers of the Summit. This is an international stage for Southeast Asian countries to move towards a future hydrogen...
Chi tiết...
The largest waste – to – energy power plant in Vietnam located in Soc Son district (Hanoi) has officially connected to the national power grid and operated phase 1. In this project, PECC1 involved in preparation of the report to supplement the project to the Hanoi city’s provincial power planning;...
Chi tiết...
On the morning of May 22, 2022, Mr. Nguyen Huu Chinh, General Director of PECC1, attended the resume of operation of unit 1 of Xekaman 3 Hydropower Plant invested by Viet Lao Power Joint Stock Company, at Dak Cheung district, Sekong province, Lao PDR.
Chi tiết...
On the morning of January 14, 2022, Mr. Le Minh Tuan - PECC1’s representative and engineers participated in “Inauguration Ceremony of Ia Pet Dak Doa 1, 2 Wind Power Project and 500kV Pleiku 3 Substation” at Ia Pet Commune, Dak Doa District, Gia Lai province. Also in the morning, PECC1 was honored to...
Chi tiết...
In this project, the Consortium of Contractor led by PECC1 and the member, Power Generation Corporation 1 GENCO 1 awarded the Package on Construction and Installation Supervision Consulting Works.
Chi tiết...
In early December 2021, PECC1 has been announced to be a winner of the public tender package: “Providing Technical consulting Services relating to Renewable Energy” within the project framework: "Renewable Energy and Energy Efficiency" (4E) by the Ministry of Industry and Trade (MOIT) and the Group...
Chi tiết...
In the afternoon in September 20th, 2021, at the Head Office of Power Engineering Consulting Joint Stock Company 1 (PECC1), the Contract Signing Ceremony for the Engineering Consulting Services for Designing works - Package 1 – Headworks – Tanahu Hydropower project (140MW) was held between Song Da –...
Chi tiết...
On July 31, 2021 Vietnam Electricity (EVN) approved the 500kV Lao Cai Substation and 220kV connection transmission lines project with the total investment of more than 1,564 billion VND at the Decision No. 999/QĐ-EVN.
Chi tiết...
Vietnam Electricity (EVN) has approved the Contractor selection result for Package No.8 (TV8-QT1) for the Consultancy Services supporting management of EPC Contract and some components of Quang Trach I Thermal Power Plant Project. The awarded Contractor is Power Engineering Consulting Joint Stock...
Chi tiết...