1. Project Owner: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 2. Investment form: Built – Own - Operate (BOO) 3. Salient features: + Installed capacity: 57MW + Mean annual energy: some of 230 million kWh + Total investment capital: 1 372 billion Vietnam Dong 4. Construction schedule: the project was started its construction in 01-2010, with following targets: + Commissioning unit 1: July 2012 + Commissioning unit 2: September 2012 + Full Operation: quarter 4/2012

Sông Bung 5 hydropower project

Map Location
 
 
Investors: Power Engineering Consulting Joint Stock Company 1
Type of construction: Hydropower
Type of advice: Design Consultancy, Pre-project survey,
Location: on Bung river - in Quảng Nam province
CSLM: 57 MW
Power of: 230.34 million kWh/year
Technology:
Start time: 1/2010 End Time: 9/2012

Details

1. Project Owner: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY1

2. Investment form: Built – Own - Operate (BOO)

3. Salient features:

            + Installed capacity:    57MW

            + Mean annual energy: some of 230 million kWh

            + Total investment capital: 1 372 billion Vietnam Dong

4. Construction schedule: the project was started its construction in 01-2010, with following targets:

            + Commissioning unit 1: July 2012

            + Commissioning unit 2: September 2012

            + Full Operation: quarter 4/2012

SOME PHOTOS ON CONTRACT SIGNING CEREMONIES FOR SÔNG BUNG 5 HYDROPOWER PROJECT

 

Credit contract signing with VietinBank, Nguyễn Trãi branch on 14-08-2009

 

Signing contract for package XD-01 with Construction 47 JSC on 21-12-2009

Signing contract for package TB-02 vwth Lilama 45.4 on 15-04-2010

Signing contract for package TB-01 with Zhongnan-Zhefu on 21-8-2010